View Issue Details
| ID | Project | Category | View Status | Date Submitted | Last Update |
|---|---|---|---|---|---|
| 0002023 | T99X171.00 SKB Eagle | General | public | 2025-01-09 14:15 | 2025-07-04 16:57 |
| Reporter | (ALTech) SH Son | Assigned To | (PM) Roisy Liang | Due Date | |
| Priority | normal | Severity | s4-minor | Reproducibility | have not tried |
| Status | closed | Resolution | fixed | ||
| Summary | 0002023: [Eagle] 2024.12 Monthly RMA_KR (Lot 22) shipping list | ||||
| Description | [Eagle] 2024.12 Monthly RMA_KR (Lot 22) shipping list | ||||
| Tags | No tags attached. | ||||
| Attach Tags | |||||
| related to | 0001690 | new | [Eagle] RMA status | |
| related to | 0002024 | feedback | (MFG) Rachel Ruan | [EAGLE] 2024.12 Mass production inspection Report |
| User List |
(ALTech) BY Lee , (ALTech) JW Kim , (ALTech) Lonnie Kim , (ALTech) SH Son , (ALTech) Sophie Lee , |
|---|
|
|
Hi Roisy, this is list of 2024.12 Monthly base RMA. Please check and feedback within 2days(01/11). If there is no response within 2 days, this lot will be considered in of warranty. Thanks SON |
|
|
Dear Mr.SON, Sorry for missing your Mantis. I checked data list of 169pcs RMA lot and see that: having one SN not having data on the system. Please help me check SN: 2149688001201404449199 We only can check data of SN: 2149688001202404449199 Please help me check: the correct SN is: 2149688001201404449199 or 2149688001202404449199 Many thanks, Roisy |
|
|
Hi Roisy It was my typo. 2149688001202404449199 is correct Thanks SON |
|
|
Dear Mr.SON, Please refer warranty time as below: all 169pcs are in of warranty. Please refer the attached file. Let me know if you have any questions. Thank you, Roisy |
|
|
Hi Roisy Thank you for the confirmation here is Invoice and vessel schedule. ETD KR 1/27, ETA HK 1/31 I will update final BL soon Thanks SON |
|
|
Hi Roisy here is final BL please refer to the attachment file Thanks SON |
|
|
Hi Roisy Please update this lot status ETA Factory ETD (after RMA) Factory Thanks SON |
|
|
Hi Mr.SON, RMA lot 22 will be ETA the factory 3rd March. And this lot will be repaired with RMA lot 21. The shipment will be ETD with RMA lot 21 in early April and will update detail vessel schedule as soon as we receive from fwd. Let me know if you have any questions. Thank you! |
|
|
Hi Mr.SON, We already reworked RMA lot 21 & 22. Please kindly check FA report and scrap report as the attached file. If no having any issue, please confirm to us for the shipment. Thanks, Roisy |
|
|
Hi Mr.SON, We already reworked RMA lot 21 & 22. Please kindly check FA report and scrap report as the attached file. If no having any issue, please confirm to us for the shipment. Thanks, Roisy |
|
|
Hi Roisy Confirm the FA report of 178pcs and 90pcs scrap list please prepare the shipment of 268pcs expect below STB. this STB need to additional defect analysis is required "2149688001202404122919 2C9811A5F077 YZV00B6" As picture symptoms are different from general burnt and may progress to a serious problem. First, please report the visual Inspection and Basic Electrical Testing to find out which component is causing it. Thanks SON |
|
|
Dear Mr Son Related to "2149688001202404122919 2C9811A5F077 YZV00B6" Scrap issue. Please review FA report on 01 pcs of waste report. Many thanks Rachel |
|
|
Hi Rachel Could you please add the rear side picture? Thanks SON |
|
|
Dear Mr Son Pls help review connecter side picture of 2149688001202404122919. Many thanks Rachel |
|
|
Hi Rachel Thank you for the update. BFX AT-100_FA_1pc scrap 2149688001202404122919 is approved. @Roisy Please ship RMA lot 21 & 22 to Korea and update shipping schedule and documents. Thanks SON |
|
|
Dear Mr.SON, I would like to send you shipping document and shipping plan of RMA lot 21&22. This shipment will be delivered by air method. Please kindly check and let me know if you have any questions: ETD VN: 26th April ETA KOREA: 04:35 pm_VN time 26th April Many thanks, Roisy |
| Date Modified | Username | Field | Change |
|---|---|---|---|
| 2025-01-09 14:15 | (ALTech) SH Son | New Issue | |
| 2025-01-09 14:15 | (ALTech) SH Son | Issue Monitored: (ALTech) BY Lee | |
| 2025-01-09 14:15 | (ALTech) SH Son | Issue Monitored: (ALTech) JW Kim | |
| 2025-01-09 14:15 | (ALTech) SH Son | Issue Monitored: (ALTech) Lonnie Kim | |
| 2025-01-09 14:15 | (ALTech) SH Son | Issue Monitored: (ALTech) SH Son | |
| 2025-01-09 14:15 | (ALTech) SH Son | Issue Monitored: (ALTech) Sophie Lee | |
| 2025-01-09 14:15 | (ALTech) SH Son | Issue Monitored: (ALTech) Sun Choul Joung | |
| 2025-01-09 14:15 | (ALTech) SH Son | Issue Monitored: (ALTech) SY Yoon | |
| 2025-01-09 14:15 | (ALTech) SH Son | Issue Monitored: (MFG) An Tran | |
| 2025-01-09 14:15 | (ALTech) SH Son | Issue Monitored: (PM) Roisy Liang | |
| 2025-01-09 14:15 | (ALTech) SH Son | Issue Monitored: (PM) Sheila Tu | |
| 2025-01-09 14:15 | (ALTech) SH Son | Issue Monitored: (PM) Tiffanie Lai | |
| 2025-01-09 14:15 | (ALTech) SH Son | Issue Monitored: (Sales) Miya Wang | |
| 2025-01-09 14:15 | (ALTech) SH Son | Relationship added | related to 0001690 |
| 2025-01-09 14:16 | (ALTech) SH Son | Note Added: 0017242 | |
| 2025-01-09 14:16 | (ALTech) SH Son | File Added: image.png | |
| 2025-01-09 14:16 | (ALTech) SH Son | File Added: 20250109_169PCS FORMAT RMA.xlsx | |
| 2025-01-09 14:18 | (ALTech) SH Son | Assigned To | => (PM) Roisy Liang |
| 2025-01-09 14:18 | (ALTech) SH Son | Status | new => assigned |
| 2025-01-09 14:21 | (ALTech) SH Son | Relationship added | related to 0002024 |
| 2025-01-17 11:33 | (PM) Roisy Liang | Note Added: 0017265 | |
| 2025-01-17 11:33 | (PM) Roisy Liang | File Added: image-2.png | |
| 2025-01-17 11:33 | (PM) Roisy Liang | File Added: image-3.png | |
| 2025-01-17 13:27 | (ALTech) SH Son | Note Added: 0017266 | |
| 2025-01-17 14:10 | (PM) Roisy Liang | Note Added: 0017267 | |
| 2025-01-17 14:10 | (PM) Roisy Liang | File Added: 20250109_169PCS FORMAT RMA-2.xlsx | |
| 2025-01-20 14:17 | (ALTech) SH Son | Note Added: 0017273 | |
| 2025-01-20 14:17 | (ALTech) SH Son | File Added: 20250117 BFX-AT100_Lot22_Invoice 선적서류_new.xls | |
| 2025-01-20 14:17 | (ALTech) SH Son | File Added: image-4.png | |
| 2025-02-03 11:54 | (ALTech) SH Son | Note Added: 0017305 | |
| 2025-02-03 11:54 | (ALTech) SH Son | File Added: FIHKG250030 FIHKG250030.pdf | |
| 2025-02-10 14:32 | (ALTech) SH Son | Note Added: 0017313 | |
| 2025-02-26 11:16 | (PM) Roisy Liang | Note Added: 0017359 | |
| 2025-04-07 09:24 | (SW) Willin Deng | Severity | s2-severe => s4-minor |
| 2025-04-15 17:25 | (PM) Roisy Liang | Note Added: 0017487 | |
| 2025-04-15 17:27 | (PM) Roisy Liang | Note Added: 0017488 | |
| 2025-04-15 17:27 | (PM) Roisy Liang | File Added: 91pcs scrap RMA T99x171.00.xlsx | |
| 2025-04-15 17:27 | (PM) Roisy Liang | File Added: FA report of 269psc RMA-T99X171 ver1.xlsx | |
| 2025-04-16 12:11 | (ALTech) SH Son | Note Added: 0017490 | |
| 2025-04-16 12:11 | (ALTech) SH Son | File Added: image-5.png | |
| 2025-04-18 16:39 | (MFG) Rachel Ruan | Note Added: 0017492 | |
| 2025-04-18 16:39 | (MFG) Rachel Ruan | File Added: BFX AT-100_FA_1pc scrap 2149688001202404122919 .pptx | |
| 2025-04-21 14:34 | (ALTech) SH Son | Note Added: 0017494 | |
| 2025-04-21 17:47 | (MFG) Rachel Ruan | Note Added: 0017495 | |
| 2025-04-21 17:47 | (MFG) Rachel Ruan | File Added: Connecter Image 2149688001202404122919.jpeg | |
| 2025-04-22 13:10 | (ALTech) SH Son | Note Added: 0017498 | |
| 2025-04-24 18:31 | (PM) Roisy Liang | Note Added: 0017510 | |
| 2025-04-24 18:31 | (PM) Roisy Liang | File Added: Invoice&packing list of 100pcs RMA T99X171 .xls | |
| 2025-04-24 18:31 | (PM) Roisy Liang | File Added: Invoice&packing list of 169pcs RMA T99X171.xls | |
| 2025-07-04 16:57 | (PM) Sheila Tu | Status | assigned => closed |
| 2025-07-04 16:57 | (PM) Sheila Tu | Resolution | open => fixed |
.png)
.png)
.png)

